DAKOTA COUNTY TRANSPORTATION DEPARTMENT

DAKOTA COUNTY, MINNESOTA

 

 

Notice is hereby given that electronic bids will be accepted by Dakota County for the aforementioned project through Dakota County's online electronic bid system (eGram), until 11:00 AM on Tuesday, April 7, 2020, at which time they will be publicly opened and read at the Empire Maintenance Facility located at 2800 160th Street West, Rosemount, MN.

 

The 2020 Dakota County Overlays & Miscellaneous Projects contract (Contract No. 32494) includes the following projects:

CP 09-59 & 09-60: Mill & overlay, pedestrian curb ramp improvements, utility repairs, and intersection revisions on CSAH 9 (Dodd Boulevard) from Ideal Way to north of 194th Street in Lakeville

CP 14-33: Mill & overlay, pedestrian curb ramp improvements, utility repairs, and signal revision on CSAH 14 (Mendota Road/Southview Boulevard) from TH 62 to TH 52 in Inver Grove Heights, West St. Paul, and South St. Paul

CP 26-61: Mill & overlay, pedestrian curb ramp improvements, utility repairs, and signal revision on CSAH 26 (70th Street) from Cahill Avenue to CSAH 56 in Inver Grove Heights

CP 26-62: Mill & overlay on CSAH 26 (Lone Oak Road) from TH 13 to CSAH 31 in Eagan

CP 28-60: Mill & overlay on CSAH 28 (80th Street) from TH 3 to 1700 feet east of TH 3 in Inver Grove Heights

CP 28-61: Mill & overlay, pedestrian curb ramp improvements, utility repairs, and signal revisions on CSAH 28 (80th Street) from CSAH 73 to CSAH 56 in Inver Grove Heights

CP 31-104: Mill & overlay, pedestrian curb ramp improvements, utility repairs, and signal revision on CSAH 31 (Pilot Knob Road) from CSAH 33 to Dolores Lane in Apple Valley and Eagan

CP 32-108: Mill & overlay, pedestrian curb ramp & median nose improvements, utility repairs, and signal revision on CSAH 32 (Cliff Road) from I-35E to CSAH 43 in Eagan

CP 42-158: Access closure on CSAH 42 at Lebanon Cemetery in Apple Valley

CP 46-51: Mill & overlay, pedestrian curb ramps, utility repairs, and signal revisions on
CSAH 46 (160th Street) from west of Ipava Avenue to CSAH 23 in Lakeville, Burnsville, and Apple Valley

CP 46-55: Mill & overlay, pedestrian curb ramps, utility repairs, and signal revision on CSAH 46 (162nd Street) from I-35 to west of Ipava Avenue in Lakeville

CP 60-25: Drainage improvements at CSAH 60 & Jasmine Way in Lakeville

CP 73-33: Mill & overlay and utility repairs on CSAH 73 (Babcock Trail) from I-494 to 1000 feet north of CSAH 14 in Inver Grove Heights and West St. Paul
 

 

The major items of work are approximately:


530,000 SQ. YD. OF MILL BITUMINOUS SURFACE
63,600 TONS of 2360 WEARING COURSE MIXTURE
10 SIGNAL REVISIONS
34,900 SQ. FT. of CONCRETE WALK
17,300 LIN. FT. of CONCRETE CURB & GUTTER
294,000 LIN. FT. of PAVEMENT MARKINGS- MULTI COMP
5,600 SQ. FT. of PAVEMENT MESSAGE/CROSSWALK-MULTI COMP
11,200 LIN. FT. of PAVEMENT MARKINGS- PREFORM TAPE
2,300 SQ. FT. of PAVEMENT MESSAGE/CROSSWALK-PREFORM TAPE
 

 

DIGITAL COPIES OF THE BIDDING DOCUMENTS ARE AVAILABLE AT:

http://www.co.dakota.mn.us/Government/DoingBusiness/BidProposalsInformation/Pages/transportation.aspx

 

These documents may be downloaded at https://egram.co.dakota.mn.us (Projects in Bidding). Bidders are responsible for all present and future downloads, including addendums and their attachments.

 

Paper documents are also available for viewing only weekdays between 8:00 AM and 4:30 PM at the County Engineer's Office, (952-891-7100) 14955 Galaxie Avenue, Apple Valley, MN 55124.

 

***ONLY REGISTERED PLANHOLDERS WILL BE ALLOWED TO BID ON PROJECTS***

There is no cost to register or download the Project Plans and Proposal documents. To become a registered plan holder, you must create an account at:  https://connex.mn.uccs.com

 

Bids must be accompanied by a certified check or corporate surety bond, made in favor of Dakota County in an amount of at least 5% of the amount bid. The right is reserved to accept or reject any or all bids and to waive any informalities therein.

 

It is anticipated that a contract to perform the work will be awarded by resolution of the Dakota County Board of Commissioners at the County Board meeting scheduled for Tuesday, April 21, 2020.