Bid Abstract

46-55 - 2020 Overlays & Misc. ProjectsBituminous Roadways, Inc. OMG Midwest Inc. dba Minnesota Paving & Materials McNamara Contracting, Inc. 
Item No.ItemUnitsQuantityUnit PriceTotal PriceUnit PriceTotal PriceUnit PriceTotal Price
2104.502ABANDON WATER MAIN STRUCTUREEACH1$3,247.00$3,247.00$12,717.41$12,717.41$1,200.00$1,200.00
2104.502REMOVE DRAINAGE STRUCTUREEACH6$1,084.00$6,504.00$787.59$4,725.54$600.00$3,600.00
2104.502REMOVE CASTINGEACH47$94.50$4,441.50$163.84$7,700.48$70.00$3,290.00
2104.503SAWING BIT PAVEMENT (FULL DEPTH)L F172$3.90$670.80$2.27$390.44$2.00$344.00
2104.503REMOVE CURB & GUTTERL F1,160$6.70$7,772.00$11.07$12,841.20$12.00$13,920.00
2104.503REMOVE AND REPLACE STORM SEWER PIPEL F136$89.00$12,104.00$193.46$26,310.56$125.00$17,000.00
2104.503REMOVE CURB & GUTTERL F266$6.70$1,782.20$12.63$3,359.58$12.00$3,192.00
2104.518REMOVE BITUMINOUS PAVEMENTS F252$0.50$126.00$2.03$511.56$1.00$252.00
2104.518REMOVE BITUMINOUS WALKS F836$0.65$543.40$1.69$1,412.84$1.00$836.00
2104.518REMOVE CONCRETE WALKS F1,365$1.20$1,638.00$3.55$4,845.75$1.50$2,047.50
2104.518REMOVE CONCRETE WALKS F1,009$1.20$1,210.80$3.75$3,783.75$1.50$1,513.50
2104.618REMOVE AND REPLACE BITUMINOUS PAVEMENTS F171$7.00$1,197.00$13.26$2,267.46$7.00$1,197.00
2232.504MILL BITUMINOUS SURFACE (2.0")S Y46,520$0.85$39,542.00$1.62$75,362.40$2.50$116,300.00
2357.506BITUMINOUS MATERIAL FOR TACK COAT (P)GAL2,326$3.00$6,978.00$1.60$3,721.60$2.50$5,815.00
2360.509TYPE SP 12.5 WEARING COURSE MIX (3;B)TON5,561$37.50$208,537.50$56.87$316,254.07$55.00$305,855.00
2504.602ADJUST GATE VALVEEACH3$300.00$900.00$332.23$996.69$500.00$1,500.00
2504.602ADJUST VALVE BOXEACH5$300.00$1,500.00$332.23$1,661.15$500.00$2,500.00
2506.502CONST DRAINAGE STRUCTURE DES 60-4020EACH3$7,390.00$22,170.00$7,343.08$22,029.24$5,800.00$17,400.00
2506.502ADJUST FRAME & RING CASTINGEACH52$746.00$38,792.00$243.43$12,658.36$500.00$26,000.00
2506.502CONST DRAINAGE STRUCTURE DESIGN SPEC 2EACH3$7,190.00$21,570.00$4,523.18$13,569.54$3,300.00$9,900.00
2506.502CASTING ASSEMBLYEACH58$961.00$55,738.00$786.28$45,604.24$500.00$29,000.00
2506.503RECONSTRUCT DRAINAGE STRUCTUREL F5$1,963.00$9,815.00$3,347.53$16,737.65$1,950.00$9,750.00
2506.602FILL SUMP DRAINAGE STRUCTUREEACH4$1,701.00$6,804.00$1,677.37$6,709.48$950.00$3,800.00
2506.602RE-MORTAR DOGHOUSEEACH45$411.00$18,495.00$420.02$18,900.90$350.00$15,750.00
2506.602PLUG DOGHOUSEEACH2$571.00$1,142.00$787.59$1,575.18$275.00$550.00
2506.602RE-MORTAR INVERTEACH1$485.00$485.00$420.02$420.02$400.00$400.00
2521.5184" CONCRETE WALKS F1,365$7.30$9,964.50$6.72$9,172.80$11.00$15,015.00
2521.5186" CONCRETE WALKS F2,026$15.00$30,390.00$13.10$26,540.60$16.00$32,416.00
2531.503CONCRETE CURB & GUTTER DESIGN B618L F1,160$47.00$54,520.00$40.90$47,444.00$44.00$51,040.00
2531.503CONCRETE CURB & GUTTER DESIGN B618L F165$34.00$5,610.00$40.60$6,699.00$44.00$7,260.00
2531.503CONCRETE CURB DESIGN V6L F86$57.00$4,902.00$50.15$4,312.90$42.00$3,612.00
2531.618TRUNCATED DOMESS F125$73.50$9,187.50$65.19$8,148.75$50.00$6,250.00
2563.601TRAFFIC CONTROLLS1$13,451.00$13,451.00$20,783.32$20,783.32$65,000.00$65,000.00
2563.601TRAFFIC CONTROLLS1$17,136.00$17,136.00$8,524.77$8,524.77$30,000.00$30,000.00
2565.616REVISE SIGNAL SYSTEM CSYS1$30,140.00$30,140.00$27,152.00$27,152.00$35,000.00$35,000.00
2575.602SITE RESTORATIONEACH4$615.00$2,460.00$927.70$3,710.80$250.00$1,000.00
2582.50324" SOLID LINE PREF TAPE GR IN (WR)L F181$27.00$4,887.00$24.07$4,356.67$25.20$4,561.20
2582.5034" BROKEN LINE MULTI COMPL F2,170$0.25$542.50$0.23$499.10$0.24$520.80
2582.50312" SOLID LINE PREF TAPE GR IN (WR)L F747$13.50$10,084.50$12.03$8,986.41$12.60$9,412.20
2582.5034" SOLID LINE MULTI COMPL F20,300$0.25$5,075.00$0.23$4,669.00$0.24$4,872.00
2582.5034" BROKEN LINE PREF TAPE (WR)L F120$6.70$804.00$6.02$722.40$6.30$756.00
2582.518PAVT MSSG MULTI COMPS F225$8.90$2,002.50$8.02$1,804.50$8.40$1,890.00
2582.518PAVT MSSG PREF TAPE (WR)S F180$24.00$4,320.00$21.73$3,911.40$22.76$4,096.80
2582.518CROSSWALK MULTI COMPS F312$6.70$2,090.40$6.02$1,878.24$6.30$1,965.60
 Totals for project 46-55 $681,272.10 $806,383.75 $867,579.60
 
Contract Total:$681,272.10$806,383.75$867,579.60