Bid Abstract

31-104 - 2020 Overlays & Misc. ProjectsBituminous Roadways, Inc. McNamara Contracting, Inc. OMG Midwest Inc. dba Minnesota Paving & Materials 
Item No.ItemUnitsQuantityUnit PriceTotal PriceUnit PriceTotal PriceUnit PriceTotal Price
2104.502SALVAGE CASTINGEACH36$94.50$3,402.00$70.00$2,520.00$184.33$6,635.88
2104.503SAWING BIT PAVEMENT (FULL DEPTH)L F154$3.90$600.60$3.00$462.00$2.27$349.58
2104.503REMOVE CURB & GUTTERL F458$6.70$3,068.60$12.00$5,496.00$12.26$5,615.08
2104.503REMOVE CURB & GUTTERL F720$6.70$4,824.00$12.00$8,640.00$11.07$7,970.40
2104.518REMOVE BITUMINOUS WALKS F563$0.65$365.95$1.00$563.00$1.35$760.05
2104.518REMOVE BITUMINOUS PAVEMENTS F188$0.65$122.20$1.00$188.00$1.35$253.80
2104.518REMOVE CONCRETE DRIVEWAY PAVEMENTS F138$1.40$193.20$3.00$414.00$3.93$542.34
2104.518REMOVE CONCRETE WALKS F457$1.20$548.40$1.50$685.50$3.48$1,590.36
2104.518REMOVE CONCRETE WALKS F1,000$1.20$1,200.00$1.50$1,500.00$3.79$3,790.00
2211.509AGGREGATE BASE CLASS 5TON6$23.50$141.00$30.00$180.00$38.90$233.40
2232.504MILL BITUMINOUS SURFACE (2.0")S Y64,698$0.85$54,993.30$1.30$84,107.40$1.24$80,225.52
2357.506BITUMINOUS MATERIAL FOR TACK COAT (P)GAL3,239$3.00$9,717.00$2.50$8,097.50$1.60$5,182.40
2357.506BITUMINOUS MATERIAL FOR TACK COAT (P)GAL22$3.00$66.00$2.50$55.00$1.60$35.20
2360.509TYPE SP 12.5 WEARING COURSE MIX (3;B)TON7,755$37.50$290,812.50$53.00$411,015.00$55.26$428,541.30
2360.509TYPE SP 12.5 WEARING COURSE MIX (3;B)TON80$98.00$7,840.00$115.00$9,200.00$141.99$11,359.20
2504.602ADJUST GATE VALVE & BOXEACH2$300.00$600.00$500.00$1,000.00$1,335.14$2,670.28
2506.502ADJUST FRAME & RING CASTINGEACH36$746.00$26,856.00$400.00$14,400.00$469.15$16,889.40
2506.602MODIFY DRAINAGE STRUCTURE (FILL SUMP CB)EACH13$1,312.00$17,056.00$950.00$12,350.00$1,081.04$14,053.52
2506.602ADJUST FRAME & RING CASTING (CB-HDPE RINGS)EACH9$297.00$2,673.00$450.00$4,050.00$586.99$5,282.91
2506.602RE-MORTAR 1' SECTIONEACH2$571.00$1,142.00$395.00$790.00$437.87$875.74
2506.602RE-MORTAR DOGHOUSEEACH11$525.00$5,775.00$350.00$3,850.00$175.31$1,928.41
2506.602REPAIR/GROUT CB OR MH INVERT/DOGHOUSESEACH1$542.00$542.00$350.00$350.00$630.13$630.13
2506.602MODIFY DRAINAGE STRUCTURE (FILL SUMP CBMH)EACH16$1,701.00$27,216.00$950.00$15,200.00$1,524.93$24,398.88
2521.5183" CONCRETE WALKS F1,000$6.70$6,700.00$8.00$8,000.00$6.33$6,330.00
2521.5183" BITUMINOUS WALKS F246$2.00$492.00$9.00$2,214.00$6.54$1,608.84
2521.5186" CONCRETE WALKS F1,075$15.00$16,125.00$17.00$18,275.00$13.44$14,448.00
2531.503CONCRETE CURB & GUTTER DESIGN B618L F375$34.00$12,750.00$41.00$15,375.00$42.37$15,888.75
2531.503CONCRETE CURB & GUTTER DESIGN B618L F720$47.00$33,840.00$41.00$29,520.00$43.49$31,312.80
2531.503CONCRETE CURB DESIGN V6L F50$57.00$2,850.00$42.00$2,100.00$64.61$3,230.50
2531.618TRUNCATED DOMESS F140$73.50$10,290.00$50.00$7,000.00$65.19$9,126.60
2563.601TRAFFIC CONTROLLS1$11,876.00$11,876.00$70,000.00$70,000.00$38,785.63$38,785.63
2563.601TRAFFIC CONTROLLS1$6,530.00$6,530.00$5,000.00$5,000.00$21,786.24$21,786.24
2565.616REVISE SIGNAL SYSTEM ISYS1$46,869.00$46,869.00$50,000.00$50,000.00$42,225.00$42,225.00
2572.506WATERGAL4,200$0.10$420.00$0.80$3,360.00$0.04$168.00
2573.502STORM DRAIN INLET PROTECTIONEACH4$190.00$760.00$168.00$672.00$150.44$601.76
2574.507COMMON TOPSOIL BORROWC Y72$48.50$3,492.00$50.00$3,600.00$50.15$3,610.80
2574.507BOULEVARD TOPSOIL BORROWC Y5$48.50$242.50$90.00$450.00$50.15$250.75
2575.602SITE RESTORATIONEACH5$615.00$3,075.00$265.00$1,325.00$877.55$4,387.75
2575.604SEEDINGS Y500$12.50$6,250.00$10.00$5,000.00$7.02$3,510.00
2575.604SEEDINGS Y50$25.50$1,275.00$9.00$450.00$7.02$351.00
2582.5034" BROKEN LINE PREF TAPE (WR)L F90$6.70$603.00$6.30$567.00$6.02$541.80
2582.5034" SOLID LINE MULTI COMPL F36,000$0.25$9,000.00$0.24$8,640.00$0.23$8,280.00
2582.50312" SOLID LINE PREF TAPE GR IN (WR)L F715$13.50$9,652.50$12.60$9,009.00$12.03$8,601.45
2582.50324" SOLID LINE MULTI COMPL F402$7.80$3,135.60$7.35$2,954.70$7.02$2,822.04
2582.50324" SOLID LINE PREF TAPE GR IN (WR)L F182$27.00$4,914.00$25.20$4,586.40$24.07$4,380.74
2582.5034" BROKEN LINE MULTI COMPL F3,400$0.25$850.00$0.24$816.00$0.23$782.00
2582.518PAVT MSSG PREF TAPE (WR)S F240$24.00$5,760.00$22.75$5,460.00$21.73$5,215.20
2582.518PAVT MSSG MULTI COMPS F375$8.90$3,337.50$8.40$3,150.00$8.02$3,007.50
 Totals for project 31-104 $660,843.85 $842,637.50 $851,066.93
 
Contract Total:$660,843.85$842,637.50$851,066.93