Contract Bid Abstract

09-59 - 2020 Overlays & Misc. ProjectsBituminous Roadways, Inc. OMG Midwest Inc. dba Minnesota Paving & Materials McNamara Contracting, Inc. 
Item No.ItemUnitsQuantityUnit PriceTotal PriceUnit PriceTotal PriceUnit PriceTotal Price
2102.503PAVEMENT MARKING REMOVALL F1,880$0.85$1,598.00$1.00$1,880.00$1.00$1,880.00
2104.502REMOVE SIGN TYPE CEACH10$40.50$405.00$40.12$401.20$37.00$370.00
2104.502REMOVE SIGN TYPE SPECIALEACH4$17.50$70.00$50.15$200.60$16.00$64.00
2104.502REMOVE CASTINGEACH3$94.50$283.50$184.33$552.99$70.00$210.00
2104.502REMOVE DRAINAGE STRUCTUREEACH2$1,084.00$2,168.00$3,570.68$7,141.36$600.00$1,200.00
2104.502REMOVE HANDHOLEEACH1$725.00$725.00$465.00$465.00$500.00$500.00
2104.503SAWING BIT PAVEMENT (FULL DEPTH)L F1,260$3.90$4,914.00$2.27$2,860.20$2.00$2,520.00
2104.503REMOVE PIPE SEWERSL F32$12.50$400.00$25.17$805.44$29.00$928.00
2104.503REMOVE CURB & GUTTERL F518$6.70$3,470.60$10.99$5,692.82$12.00$6,216.00
2104.503REMOVE CURB & GUTTERL F1,450$6.70$9,715.00$11.05$16,022.50$12.00$17,400.00
2104.503REMOVE AND REPLACE STORM SEWER PIPEL F24$89.00$2,136.00$62.98$1,511.52$120.00$2,880.00
2104.518REMOVE BITUMINOUS WALKS F1,713$0.65$1,113.45$1.29$2,209.77$1.00$1,713.00
2104.518REMOVE BITUMINOUS PAVEMENTS F644$0.50$322.00$0.95$611.80$1.00$644.00
2104.518REMOVE CONCRETE WALKS F1,078$1.20$1,293.60$3.23$3,481.94$1.50$1,617.00
2104.518REMOVE CONCRETE WALKS F2,065$1.20$2,478.00$3.07$6,339.55$1.50$3,097.50
2104.603ABANDON CONDUITL F41$11.00$451.00$25.00$1,025.00$11.00$451.00
2211.509AGGREGATE BASE CLASS 5TON20$23.50$470.00$37.86$757.20$30.00$600.00
2232.504MILL BITUMINOUS SURFACE (2.0")S Y30,749$0.85$26,136.65$1.33$40,896.17$2.00$61,498.00
2357.506BITUMINOUS MATERIAL FOR TACK COAT (P)GAL1,568$3.00$4,704.00$1.60$2,508.80$2.00$3,136.00
2360.509TYPE SP 12.5 WEARING COURSE MIX (3;B)TON3,778$37.50$141,675.00$58.76$221,995.28$56.00$211,568.00
2503.50315" RC PIPE SEWER DES 3006 CL VL F22$72.00$1,584.00$66.89$1,471.58$88.00$1,936.00
2503.50336" RC PIPE SEWER DES 3006 CL IIIL F32$291.00$9,312.00$183.03$5,856.96$152.00$4,864.00
2503.602CONNECT TO EXISTING STORM SEWEREACH4$1,449.00$5,796.00$787.59$3,150.36$2,000.00$8,000.00
2504.602ADJUST GATE VALVEEACH1$300.00$300.00$332.23$332.23$500.00$500.00
2504.602ADJUST VALVE BOXEACH6$300.00$1,800.00$332.23$1,993.38$500.00$3,000.00
2506.502ADJUST FRAME & RING CASTINGEACH4$297.00$1,188.00$428.28$1,713.12$850.00$3,400.00
2506.502CASTING ASSEMBLYEACH6$961.00$5,766.00$441.28$2,647.68$460.00$2,760.00
2506.502CASTING ASSEMBLYEACH4$961.00$3,844.00$441.28$1,765.12$1,100.00$4,400.00
2506.502CONST DRAINAGE STRUCTURE DESIGN SPEC (2'X3')EACH2$4,017.00$8,034.00$5,384.87$10,769.74$3,500.00$7,000.00
2506.502ADJUST FRAME & RING CASTINGEACH87$746.00$64,902.00$769.75$66,968.25$500.00$43,500.00
2506.503CONST DRAINAGE STRUCTURE DES 2'X3' BOXL F4$1,004.00$4,016.00$1,046.44$4,185.76$800.00$3,200.00
2506.503CONST DRAINAGE STRUCTURE DES 48-4020L F4$1,096.00$4,384.00$1,201.29$4,805.16$1,000.00$4,000.00
2506.503CONST DRAINAGE STRUCTURE DES 60-4020L F11$1,432.00$15,752.00$1,610.72$17,717.92$1,000.00$11,000.00
2506.503RECONSTRUCT DRAINAGE STRUCTUREL F0.7$2,556.00$1,789.20$2,018.97$1,413.28$3,000.00$2,100.00
2506.602RE-MORTAR DOGHOUSEEACH22$411.00$9,042.00$175.31$3,856.82$350.00$7,700.00
2506.602RE-MORTAR INVERTEACH16$479.00$7,664.00$175.31$2,804.96$375.00$6,000.00
2521.5183" BITUMINOUS WALKS F800$2.00$1,600.00$3.40$2,720.00$8.00$6,400.00
2521.5184" CONCRETE WALKS F1,180$7.30$8,614.00$6.81$8,035.80$10.00$11,800.00
2521.5183" CONCRETE WALKS F2,100$6.70$14,070.00$5.91$12,411.00$6.00$12,600.00
2521.5184" CONCRETE WALK SPECIALS F885$18.00$15,930.00$16.26$14,390.10$16.00$14,160.00
2521.5186" CONCRETE WALKS F1,710$15.00$25,650.00$13.04$22,298.40$17.00$29,070.00
2531.503CONCRETE CURB & GUTTER DESIGN B418L F879$34.00$29,886.00$39.52$34,738.08$42.00$36,918.00
2531.503CONCRETE CURB & GUTTER DESIGN B418L F1,450$105.00$152,250.00$40.00$58,000.00$42.00$60,900.00
2531.503CONCRETE CURB & GUTTER DESIGN B618L F205$34.00$6,970.00$40.46$8,294.30$45.00$9,225.00
2531.618TRUNCATED DOMESS F212$73.50$15,582.00$65.19$13,820.28$50.00$10,600.00
2563.601TRAFFIC CONTROLLS1$7,699.00$7,699.00$4,513.11$4,513.11$30,000.00$30,000.00
2563.601TRAFFIC CONTROLLS1$17,136.00$17,136.00$44,203.79$44,203.79$56,500.00$56,500.00
2564.502DELINEATOR TYPE X4-6EACH2$232.00$464.00$290.85$581.70$210.00$420.00
2564.518SIGN PANELS TYPE CS F92$58.00$5,336.00$68.20$6,274.40$53.00$4,876.00
2564.518SIGN PANELS TYPE SPECIALS F20$35.00$700.00$55.16$1,103.20$32.00$640.00
2575.602SITE RESTORATIONEACH7$615.00$4,305.00$877.55$6,142.85$265.00$1,855.00
2582.50324" SOLID LINE MULTI COMPL F256$7.80$1,996.80$7.02$1,797.12$7.35$1,881.60
2582.5034" BROKEN LINE MULTI COMPL F1,370$0.25$342.50$0.23$315.10$0.24$328.80
2582.5034" SOLID LINE MULTI COMPL F12,926$0.25$3,231.50$0.23$2,972.98$0.24$3,102.24
2582.50312" SOLID LINE MULTI COMPL F355$3.90$1,384.50$3.51$1,246.05$3.68$1,306.40
2582.518PAVT MSSG MULTI COMPS F375$8.90$3,337.50$8.02$3,007.50$8.40$3,150.00
2582.518CROSSWALK MULTI COMPS F288$6.70$1,929.60$6.02$1,733.76$6.30$1,814.40
 Totals for project 09-59 $668,116.40 $697,410.98 $729,399.94
 
14-33 - 2020 Overlays & Misc. ProjectsBituminous Roadways, Inc. OMG Midwest Inc. dba Minnesota Paving & Materials McNamara Contracting, Inc. 
Item No.ItemUnitsQuantityUnit PriceTotal PriceUnit PriceTotal PriceUnit PriceTotal Price
2104.502REMOVE CASTING & RINGS (SANITARY)EACH6$94.50$567.00$163.84$983.04$165.50$993.00
2104.502REMOVE CASTING & RINGS (STORM)EACH21$94.50$1,984.50$163.84$3,440.64$220.58$4,632.18
2104.503REMOVE CURB & GUTTERL F630$6.70$4,221.00$11.11$6,999.30$20.39$12,845.70
2104.503SAWING BIT PAVEMENT (FULL DEPTH)L F131$3.90$510.90$2.27$297.37$5.20$681.20
2104.503REMOVE CURB & GUTTERL F528$6.70$3,537.60$11.04$5,829.12$20.39$10,765.92
2104.518REMOVE CONCRETE WALKS F2,586$1.20$3,103.20$3.32$8,585.52$4.16$10,757.76
2104.518REMOVE BITUMINOUS PAVEMENTS F330$0.50$165.00$1.52$501.60$3.90$1,287.00
2104.518REMOVE BITUMINOUS WALKS F21$0.65$13.65$1.35$28.35$10.40$218.40
2104.602REMOVE GATE VALVE TOP SECTIONEACH12$94.50$1,134.00$122.88$1,474.56$241.53$2,898.36
2232.504MILL BITUMINOUS SURFACE (2.0")S Y44,664$0.85$37,964.40$1.51$67,442.64$1.10$49,130.40
2357.506BITUMINOUS MATERIAL FOR TACK COAT (P)GAL2,235$3.00$6,705.00$1.60$3,576.00$1.55$3,464.25
2360.509TYPE SP 12.5 WEARING COURSE MIX (3;B)TON5,339$37.50$200,212.50$59.06$315,321.34$56.42$301,226.38
2503.602EXTERNAL MANHOLE CHIMNEY SEALEACH6$362.00$2,172.00$150.44$902.64$183.57$1,101.42
2504.602GATE VALVE TOP SECTIONEACH12$294.00$3,528.00$283.54$3,402.48$430.11$5,161.32
2504.602ADJUST GATE VALVEEACH2$300.00$600.00$332.23$664.46$609.72$1,219.44
2506.602CASTING & RINGS (R-3067-V)EACH21$1,166.00$24,486.00$886.66$18,619.86$891.57$18,722.97
2506.602INTERNAL ADJUSTING RING SEALANT (SANITARY)EACH1$690.00$690.00$377.10$377.10$566.50$566.50
2506.602CASTING & RINGS (R-1642) (SANITARY)EACH6$967.00$5,802.00$751.26$4,507.56$1,028.93$6,173.58
2506.602INTERNAL ADJUSTING RING SEALANT (STORM)EACH38$690.00$26,220.00$591.72$22,485.36$566.50$21,527.00
2521.5186" CONCRETE WALKS F2,588$15.00$38,820.00$13.01$33,669.88$16.32$42,236.16
2531.503CONCRETE CURB DESIGN V6L F12$70.00$840.00$50.15$601.80$49.20$590.40
2531.503CONCRETE CURB & GUTTER DESIGN B618L F528$47.00$24,816.00$40.00$21,120.00$37.61$19,858.08
2531.503CONCRETE CURB & GUTTER DESIGN B618L F630$47.00$29,610.00$41.66$26,245.80$37.58$23,675.40
2531.618TRUNCATED DOMESS F468$73.50$34,398.00$65.19$30,508.92$51.50$24,102.00
2563.601TRAFFIC CONTROLLS1$27,733.00$27,733.00$4,513.11$4,513.11$18,376.51$18,376.51
2563.601TRAFFIC CONTROLLS1$30,051.00$30,051.00$29,709.26$29,709.26$48,303.96$48,303.96
2565.616REVISE SIGNAL SYSTEM ASYS1$33,817.00$33,817.00$31,025.00$31,025.00$32,600.00$32,600.00
2573.502STORM DRAIN INLET PROTECTIONEACH30$190.00$5,700.00$150.44$4,513.20$149.31$4,479.30
2574.507BOULEVARD TOPSOIL BORROWC Y30$48.50$1,455.00$50.15$1,504.50$60.77$1,823.10
2575.504SODDING TYPE SALT TOLERANTS Y140$29.00$4,060.00$30.09$4,212.60$13.39$1,874.60
2575.602SITE RESTORATIONEACH30$615.00$18,450.00$877.55$26,326.50$283.25$8,497.50
2582.5034" SOLID LINE MULTI COMPL F25,500$0.25$6,375.00$0.23$5,865.00$0.24$6,120.00
2582.5034" BROKEN LINE MULTI COMPL F2,050$0.25$512.50$0.23$471.50$0.24$492.00
2582.50312" SOLID LINE PREF TAPE GR IN (WR)L F586$13.50$7,911.00$12.03$7,049.58$12.36$7,242.96
2582.50324" SOLID LINE MULTI COMPL F244$7.80$1,903.20$7.02$1,712.88$7.21$1,759.24
2582.50324" SOLID LINE PREF TAPE GR IN (WR)L F147$27.00$3,969.00$24.07$3,538.29$24.72$3,633.84
2582.518CROSSWALK MULTI COMPS F480$6.70$3,216.00$6.02$2,889.60$6.18$2,966.40
2582.518PAVT MSSG MULTI COMPS F615$8.90$5,473.50$8.02$4,932.30$8.24$5,067.60
2582.518PAVT MSSG PREF TAPE (WR)S F405$24.00$9,720.00$21.73$8,800.65$22.32$9,039.60
 Totals for project 14-33 $612,446.95 $714,649.31 $716,111.43
 
26-61 - 2020 Overlays & Misc. ProjectsBituminous Roadways, Inc. OMG Midwest Inc. dba Minnesota Paving & Materials McNamara Contracting, Inc. 
Item No.ItemUnitsQuantityUnit PriceTotal PriceUnit PriceTotal PriceUnit PriceTotal Price
2104.502REMOVE CASTING & RINGS (STORM)EACH72$94.50$6,804.00$163.84$11,796.48$165.49$11,915.28
2104.503REMOVE CURB & GUTTERL F267$6.70$1,788.90$9.10$2,429.70$21.43$5,721.81
2104.503REMOVE CURB & GUTTERL F2,000$6.70$13,400.00$11.07$22,140.00$9.36$18,720.00
2104.503SAWING BIT PAVEMENT (FULL DEPTH)L F8$3.90$31.20$2.27$18.16$26.01$208.08
2104.518REMOVE BITUMINOUS WALKS F67$0.65$43.55$1.52$101.84$10.40$696.80
2104.518REMOVE CONCRETE WALKS F869$1.20$1,042.80$3.89$3,380.41$5.20$4,518.80
2104.618REMOVE AND REPLACE BITUMINOUS PAVEMENTS F114$7.00$798.00$12.55$1,430.70$10.86$1,238.04
2232.504MILL BITUMINOUS SURFACE (2.0")S Y36,070$0.85$30,659.50$1.45$52,301.50$1.13$40,759.10
2357.506BITUMINOUS MATERIAL FOR TACK COAT (P)GAL1,804$3.00$5,412.00$1.60$2,886.40$1.55$2,796.20
2360.509TYPE SP 12.5 WEARING COURSE MIX (3;B)TON4,312$37.50$161,700.00$58.32$251,475.84$56.40$243,196.80
2504.602ADJUST GATE VALVEEACH13$300.00$3,900.00$332.23$4,318.99$608.93$7,916.09
2506.602CASTING & RINGS (R-1642)EACH3$967.00$2,901.00$826.48$2,479.44$1,029.05$3,087.15
2506.602CASTING & RINGS (R-3067-V)EACH69$1,166.00$80,454.00$911.96$62,925.24$891.57$61,518.33
2506.602INTERNAL ADJUSTING RING SEALANT (SANITARY)EACH22$690.00$15,180.00$381.11$8,384.42$566.50$12,463.00
2506.602RECONSTRUCT STORM SEWER MANHOLEEACH3$3,595.00$10,785.00$3,555.09$10,665.27$5,202.02$15,606.06
2506.602INTERNAL ADJUSTING RING SEALANT (STORM)EACH93$690.00$64,170.00$591.72$55,029.96$566.50$52,684.50
2521.5186" CONCRETE WALKS F1,036$15.00$15,540.00$13.47$13,954.92$16.75$17,353.00
2531.503CONCRETE CURB & GUTTER DESIGN B418L F267$34.00$9,078.00$41.71$11,136.57$36.09$9,636.03
2531.503CONCRETE CURB & GUTTER DESIGN B418L F2,000$105.00$210,000.00$39.62$79,240.00$28.22$56,440.00
2531.503CONCRETE CURB DESIGN V6L F99$57.00$5,643.00$63.01$6,237.99$50.22$4,971.78
2531.618TRUNCATED DOMESS F120$73.50$8,820.00$65.19$7,822.80$51.50$6,180.00
2563.601TRAFFIC CONTROLLS1$13,823.00$13,823.00$25,697.60$25,697.60$21,001.72$21,001.72
2563.601TRAFFIC CONTROLLS1$6,704.00$6,704.00$3,510.20$3,510.20$29,192.39$29,192.39
2565.616REVISE SIGNAL SYSTEM BSYS1$24,517.00$24,517.00$22,493.00$22,493.00$23,200.00$23,200.00
2573.502STORM DRAIN INLET PROTECTIONEACH71$190.00$13,490.00$150.44$10,681.24$149.31$10,601.01
2574.507BOULEVARD TOPSOIL BORROWC Y120$48.50$5,820.00$50.15$6,018.00$55.62$6,674.40
2575.504SODDING TYPE SALT TOLERANTS Y700$24.00$16,800.00$30.09$21,063.00$9.27$6,489.00
2575.602SITE RESTORATIONEACH4$615.00$2,460.00$877.55$3,510.20$309.00$1,236.00
2582.50324" SOLID LINE PREF TAPE GR IN (WR)L F170$27.00$4,590.00$24.07$4,091.90$24.72$4,202.40
2582.50324" SOLID LINE MULTI COMPL F127$7.80$990.60$7.02$891.54$7.21$915.67
2582.50312" SOLID LINE PREF TAPE GR IN (WR)L F700$13.50$9,450.00$12.03$8,421.00$12.36$8,652.00
2582.5034" SOLID LINE MULTI COMPL F18,300$0.25$4,575.00$0.23$4,209.00$0.24$4,392.00
2582.50312" SOLID LINE MULTI COMPL F616$3.90$2,402.40$3.51$2,162.16$0.36$221.76
2582.5034" BROKEN LINE MULTI COMPL F60$0.25$15.00$0.23$13.80$0.24$14.40
2582.518PAVT MSSG MULTI COMPS F600$8.90$5,340.00$8.02$4,812.00$8.24$4,944.00
2582.518PAVT MSSG PREF TAPE (WR)S F72$24.00$1,728.00$21.73$1,564.56$22.32$1,607.04
 Totals for project 26-61 $760,855.95 $729,295.83 $700,970.64
 
26-62 - 2020 Overlays & Misc. ProjectsBituminous Roadways, Inc. OMG Midwest Inc. dba Minnesota Paving & Materials McNamara Contracting, Inc. 
Item No.ItemUnitsQuantityUnit PriceTotal PriceUnit PriceTotal PriceUnit PriceTotal Price
2104.503REMOVE CURB & GUTTERL F50$6.70$335.00$12.53$626.50$21.39$1,069.50
2221.509SHOULDER BASE AGGREGATE CLASS 2 MODTON145$38.00$5,510.00$37.02$5,367.90$57.38$8,320.10
2232.504MILL BITUMINOUS SURFACE (2.0")S Y15,500$0.85$13,175.00$1.39$21,545.00$1.14$17,670.00
2357.506BITUMINOUS MATERIAL FOR TACK COAT (P)GAL775$3.00$2,325.00$1.60$1,240.00$1.55$1,201.25
2360.509TYPE SP 12.5 WEARING COURSE MIX (3;B)TON1,853$37.50$69,487.50$56.44$104,583.32$56.57$104,824.21
2504.602ADJUST GATE VALVEEACH2$300.00$600.00$332.23$664.46$609.72$1,219.44
2531.503CONCRETE CURB & GUTTER DESIGN B418L F50$34.00$1,700.00$45.85$2,292.50$94.56$4,728.00
2563.601TRAFFIC CONTROLLS1$20,406.00$20,406.00$23,240.46$23,240.46$13,126.08$13,126.08
2582.5034" SOLID LINE MULTI COMPL F10,786$0.25$2,696.50$0.23$2,480.78$0.24$2,588.64
2582.50324" SOLID LINE MULTI COMPL F197$7.80$1,536.60$7.02$1,382.94$7.21$1,420.37
2582.5034" BROKEN LINE MULTI COMPL F650$0.25$162.50$0.23$149.50$0.24$156.00
2582.5034" BROKEN LINE PREF TAPE (WR)L F30$6.70$201.00$6.02$180.60$6.18$185.40
2582.50312" SOLID LINE PREF TAPE GR IN (WR)L F218$13.50$2,943.00$12.03$2,622.54$12.36$2,694.48
2582.50324" SOLID LINE PREF TAPE GR IN (WR)L F46$27.00$1,242.00$24.07$1,107.22$24.72$1,137.12
2582.518PAVT MSSG MULTI COMPS F49$8.90$436.10$8.02$392.98$8.24$403.76
2582.518PAVT MSSG PREF TAPE (WR)S F30$24.00$720.00$21.73$651.90$22.32$669.60
 Totals for project 26-62 $123,476.20 $168,528.60 $161,413.95
 
28-60 - 2020 Overlays & Misc. ProjectsBituminous Roadways, Inc. OMG Midwest Inc. dba Minnesota Paving & Materials McNamara Contracting, Inc. 
Item No.ItemUnitsQuantityUnit PriceTotal PriceUnit PriceTotal PriceUnit PriceTotal Price
2104.502REMOVE CASTING & RINGS (STORM)EACH8$94.50$756.00$163.84$1,310.72$220.94$1,767.52
2104.503REMOVE CURB & GUTTERL F100$6.70$670.00$12.53$1,253.00$21.43$2,143.00
2104.503REMOVE CURB & GUTTERL F200$6.70$1,340.00$12.83$2,566.00$23.52$4,704.00
2112.603SHOULDER PREPARATIONL F1,695$1.20$2,034.00$1.12$1,898.40$2.17$3,678.15
2221.509SHOULDER BASE AGGREGATE CLASS 2 MODTON40$38.00$1,520.00$45.66$1,826.40$68.27$2,730.80
2232.504MILL BITUMINOUS SURFACE (2.0")S Y8,099$0.85$6,884.15$1.55$12,553.45$1.52$12,310.48
2357.506BITUMINOUS MATERIAL FOR TACK COAT (P)GAL405$3.00$1,215.00$1.60$648.00$1.55$627.75
2360.509TYPE SP 12.5 WEARING COURSE MIX (3;B)TON968$37.50$36,300.00$57.43$55,592.24$56.33$54,527.44
2506.602INTERNAL ADJUSTING RING SEALANT (STORM)EACH9$690.00$6,210.00$591.72$5,325.48$566.50$5,098.50
2506.602CASTING & RINGS (R-3250-DVSP)EACH5$1,319.00$6,595.00$1,017.68$5,088.40$1,046.94$5,234.70
2506.602CASTING & RINGS (R-3067-V)EACH3$1,166.00$3,498.00$823.78$2,471.34$891.58$2,674.74
2531.503CONCRETE CURB & GUTTER DESIGN B618L F200$105.00$21,000.00$45.85$9,170.00$52.20$10,440.00
2531.503CONCRETE CURB & GUTTER DESIGN B618L F100$34.00$3,400.00$45.52$4,552.00$52.40$5,240.00
2563.601TRAFFIC CONTROLLS1$13,079.00$13,079.00$4,513.11$4,513.11$3,465.28$3,465.28
2563.601TRAFFIC CONTROLLS1$20,406.00$20,406.00$38,058.52$38,058.52$7,350.60$7,350.60
2573.502STORM DRAIN INLET PROTECTIONEACH9$190.00$1,710.00$150.44$1,353.96$149.31$1,343.79
2574.507BOULEVARD TOPSOIL BORROWC Y12$48.50$582.00$50.15$601.80$76.22$914.64
2575.504SODDING TYPE SALT TOLERANTS Y70$30.50$2,135.00$30.09$2,106.30$25.75$1,802.50
2582.50324" SOLID LINE MULTI COMPL F44$7.80$343.20$7.02$308.88$7.21$317.24
2582.5034" SOLID LINE MULTI COMPL F7,276$0.25$1,819.00$0.23$1,673.48$0.24$1,746.24
2582.518CROSSWALK MULTI COMPS F198$6.70$1,326.60$6.02$1,191.96$6.18$1,223.64
2582.518PAVT MSSG MULTI COMPS F15$8.90$133.50$8.02$120.30$8.24$123.60
 Totals for project 28-60 $132,956.45 $154,183.74 $129,464.61
 
28-61 - 2020 Overlays & Misc. ProjectsBituminous Roadways, Inc. OMG Midwest Inc. dba Minnesota Paving & Materials McNamara Contracting, Inc. 
Item No.ItemUnitsQuantityUnit PriceTotal PriceUnit PriceTotal PriceUnit PriceTotal Price
2104.502REMOVE GATE VALVE & BOXEACH3$1,643.00$4,929.00$2,507.29$7,521.87$457.78$1,373.34
2104.502REMOVE CASTING & RINGS (STORM)EACH63$94.50$5,953.50$163.84$10,321.92$220.66$13,901.58
2104.502REMOVE CASTING & RINGS (SANITARY)EACH7$94.50$661.50$163.84$1,146.88$165.26$1,156.82
2104.502REMOVE DRAINAGE STRUCTUREEACH2$1,084.00$2,168.00$2,131.89$4,263.78$915.56$1,831.12
2104.503REMOVE CURB & GUTTERL F770$6.70$5,159.00$11.10$8,547.00$21.95$16,901.50
2104.503REMOVE CURB & GUTTERL F1,730$6.70$11,591.00$11.08$19,168.40$20.39$35,274.70
2104.503SAWING BIT PAVEMENT (FULL DEPTH)L F560$3.90$2,184.00$2.27$1,271.20$3.12$1,747.20
2104.518REMOVE CONCRETE WALKS F2,880$1.20$3,456.00$3.69$10,627.20$4.16$11,980.80
2104.518REMOVE BITUMINOUS WALKS F1,315$0.65$854.75$1.35$1,775.25$2.08$2,735.20
2104.518REMOVE BITUMINOUS PAVEMENTS F3,267$0.50$1,633.50$1.35$4,410.45$2.60$8,494.20
2104.518REMOVE CONCRETE DRIVEWAY PAVEMENTS F680$1.40$952.00$3.06$2,080.80$5.20$3,536.00
2104.602REMOVE GATE VALVE TOP SECTIONEACH31$129.00$3,999.00$122.88$3,809.28$241.53$7,487.43
2104.618REMOVE AND REPLACE BITUMINOUS PAVEMENTS F371$7.00$2,597.00$7.86$2,916.06$8.60$3,190.60
2211.509AGGREGATE BASE CLASS 5TON115$23.50$2,702.50$38.90$4,473.50$25.31$2,910.65
2232.504MILL BITUMINOUS SURFACE (2.0")S Y65,674$0.85$55,822.90$1.25$82,092.50$0.95$62,390.30
2357.506BITUMINOUS MATERIAL FOR TACK COAT (P)GAL3,284$3.00$9,852.00$1.60$5,254.40$1.55$5,090.20
2360.509TYPE SP 12.5 WEARING COURSE MIX (3;B)TON7,897$37.50$296,137.50$56.08$442,863.76$54.30$428,807.10
2503.602CONSTRUCT BULKHEADEACH1$942.00$942.00$2,131.89$2,131.89$957.17$957.17
2503.602RECONSTRUCT SANITARY MANHOLEEACH6$3,766.00$22,596.00$4,232.94$25,397.64$6,762.63$40,575.78
2503.602EXTERNAL MANHOLE CHIMNEY SEALEACH13$362.00$4,706.00$150.44$1,955.72$183.59$2,386.67
2504.602GATE VALVE TOP SECTIONEACH31$294.00$9,114.00$332.23$10,299.13$430.14$13,334.34
2504.602GATE VALVE BOXEACH3$2,168.00$6,504.00$4,520.82$13,562.46$2,132.83$6,398.49
2506.502CONST DRAINAGE STRUCTURE DES 48-4020EACH1$5,524.00$5,524.00$6,961.29$6,961.29$7,074.75$7,074.75
2506.602CASTING & RINGS (R-3067-V)EACH25$1,166.00$29,150.00$774.71$19,367.75$891.57$22,289.25
2506.602CASTING & RINGS (R-1642) (SANITARY)EACH7$967.00$6,769.00$784.78$5,493.46$1,028.84$7,201.88
2506.602RECONSTRUCT STORM SEWER MANHOLEEACH2$3,253.00$6,506.00$4,104.30$8,208.60$7,594.95$15,189.90
2506.602REMOVE & REPLACE INVERTS/DOGHOUSESEACH4$542.00$2,168.00$647.88$2,591.52$2,469.97$9,879.88
2506.602CASTING & RINGS (R-3250-DVSP)EACH26$1,319.00$34,294.00$915.12$23,793.12$1,046.95$27,220.70
2506.602CONNECT INTO EXISTING STORM SEWEREACH2$1,255.00$2,510.00$1,816.78$3,633.56$998.79$1,997.58
2506.602INTERNAL ADJUSTING RING SEALANT (SANITARY)EACH13$690.00$8,970.00$377.10$4,902.30$566.50$7,364.50
2506.602INTERNAL ADJUSTING RING SEALANT (STORM)EACH73$690.00$50,370.00$591.72$43,195.56$566.50$41,354.50
2506.602CASTING & RINGS (R-1642)EACH12$967.00$11,604.00$784.78$9,417.36$1,028.67$12,344.04
2521.5183" BITUMINOUS WALKS F171$2.00$342.00$4.51$771.21$7.25$1,239.75
2521.5183" CONCRETE WALKS F625$6.70$4,187.50$6.80$4,250.00$9.31$5,818.75
2521.5186" CONCRETE WALKS F5,181$15.00$77,715.00$12.86$66,627.66$15.50$80,305.50
2531.503CONCRETE CURB & GUTTER DESIGN B618L F1,730$105.00$181,650.00$40.02$69,234.60$31.26$54,079.80
2531.503CONCRETE CURB & GUTTER DESIGN B618L F1,042$34.00$35,428.00$40.17$41,857.14$35.70$37,199.40
2531.503CONCRETE CURB DESIGN V6L F168$57.00$9,576.00$61.85$10,390.80$46.94$7,885.92
2531.5046" CONCRETE DRIVEWAY PAVEMENTS Y76$88.00$6,688.00$91.22$6,932.72$103.68$7,879.68
2531.618TRUNCATED DOMESS F702$73.50$51,597.00$65.19$45,763.38$51.50$36,153.00
2563.601TRAFFIC CONTROLLS1$11,430.00$11,430.00$40,239.86$40,239.86$66,680.46$66,680.46
2563.601TRAFFIC CONTROLLS1$10,181.00$10,181.00$4,513.11$4,513.11$36,753.01$36,753.01
2565.616REVISE SIGNAL SYSTEM GSYS1$29,711.00$29,711.00$24,345.00$24,345.00$25,600.00$25,600.00
2565.616REVISE SIGNAL SYSTEM HSYS1$26,700.00$26,700.00$24,496.00$24,496.00$25,800.00$25,800.00
2573.502STORM DRAIN INLET PROTECTIONEACH66$190.00$12,540.00$150.44$9,929.04$150.00$9,900.00
2574.507BOULEVARD TOPSOIL BORROWC Y82$48.50$3,977.00$50.15$4,112.30$50.47$4,138.54
2575.504SODDING TYPE SALT TOLERANTS Y467$29.00$13,543.00$30.09$14,052.03$9.79$4,571.93
2575.602SITE RESTORATIONEACH33$615.00$20,295.00$877.55$28,959.15$283.25$9,347.25
2582.50324" SOLID LINE MULTI COMPL F495$7.80$3,861.00$7.02$3,474.90$7.21$3,568.95
2582.5034" DOTTED LINE PREF TAPE (WR)L F146$6.70$978.20$6.02$878.92$6.18$902.28
2582.5034" BROKEN LINE MULTI COMPL F1,950$0.25$487.50$0.23$448.50$0.24$468.00
2582.5034" SOLID LINE MULTI COMPL F39,500$0.25$9,875.00$0.23$9,085.00$0.24$9,480.00
2582.50312" SOLID LINE MULTI COMPL F154$3.90$600.60$3.51$540.54$3.61$555.94
2582.5034" BROKEN LINE PREF TAPE (WR)L F240$6.70$1,608.00$6.02$1,444.80$6.18$1,483.20
2582.50324" SOLID LINE PREF TAPE GR IN (WR)L F276$27.00$7,452.00$24.07$6,643.32$24.72$6,822.72
2582.50312" SOLID LINE PREF TAPE GR IN (WR)L F1,265$13.50$17,077.50$12.03$15,217.95$12.36$15,635.40
2582.518CROSSWALK MULTI COMPS F528$6.70$3,537.60$6.02$3,178.56$6.18$3,263.04
2582.518PAVT MSSG PREF TAPE (WR)S F420$24.00$10,080.00$21.73$9,126.60$22.32$9,374.40
2582.518PAVT MSSG MULTI COMPS F359$8.90$3,195.10$8.02$2,879.18$8.24$2,958.16
 Totals for project 28-61 $1,166,693.15 $1,242,847.88 $1,292,243.25
 
31-104 - 2020 Overlays & Misc. ProjectsBituminous Roadways, Inc. OMG Midwest Inc. dba Minnesota Paving & Materials McNamara Contracting, Inc. 
Item No.ItemUnitsQuantityUnit PriceTotal PriceUnit PriceTotal PriceUnit PriceTotal Price
2104.502SALVAGE CASTINGEACH36$94.50$3,402.00$184.33$6,635.88$70.00$2,520.00
2104.503SAWING BIT PAVEMENT (FULL DEPTH)L F154$3.90$600.60$2.27$349.58$3.00$462.00
2104.503REMOVE CURB & GUTTERL F720$6.70$4,824.00$11.07$7,970.40$12.00$8,640.00
2104.503REMOVE CURB & GUTTERL F458$6.70$3,068.60$12.26$5,615.08$12.00$5,496.00
2104.518REMOVE CONCRETE DRIVEWAY PAVEMENTS F138$1.40$193.20$3.93$542.34$3.00$414.00
2104.518REMOVE CONCRETE WALKS F1,000$1.20$1,200.00$3.79$3,790.00$1.50$1,500.00
2104.518REMOVE CONCRETE WALKS F457$1.20$548.40$3.48$1,590.36$1.50$685.50
2104.518REMOVE BITUMINOUS PAVEMENTS F188$0.65$122.20$1.35$253.80$1.00$188.00
2104.518REMOVE BITUMINOUS WALKS F563$0.65$365.95$1.35$760.05$1.00$563.00
2211.509AGGREGATE BASE CLASS 5TON6$23.50$141.00$38.90$233.40$30.00$180.00
2232.504MILL BITUMINOUS SURFACE (2.0")S Y64,698$0.85$54,993.30$1.24$80,225.52$1.30$84,107.40
2357.506BITUMINOUS MATERIAL FOR TACK COAT (P)GAL22$3.00$66.00$1.60$35.20$2.50$55.00
2357.506BITUMINOUS MATERIAL FOR TACK COAT (P)GAL3,239$3.00$9,717.00$1.60$5,182.40$2.50$8,097.50
2360.509TYPE SP 12.5 WEARING COURSE MIX (3;B)TON7,755$37.50$290,812.50$55.26$428,541.30$53.00$411,015.00
2360.509TYPE SP 12.5 WEARING COURSE MIX (3;B)TON80$98.00$7,840.00$141.99$11,359.20$115.00$9,200.00
2504.602ADJUST GATE VALVE & BOXEACH2$300.00$600.00$1,335.14$2,670.28$500.00$1,000.00
2506.502ADJUST FRAME & RING CASTINGEACH36$746.00$26,856.00$469.15$16,889.40$400.00$14,400.00
2506.602MODIFY DRAINAGE STRUCTURE (FILL SUMP CB)EACH13$1,312.00$17,056.00$1,081.04$14,053.52$950.00$12,350.00
2506.602RE-MORTAR DOGHOUSEEACH11$525.00$5,775.00$175.31$1,928.41$350.00$3,850.00
2506.602MODIFY DRAINAGE STRUCTURE (FILL SUMP CBMH)EACH16$1,701.00$27,216.00$1,524.93$24,398.88$950.00$15,200.00
2506.602REPAIR/GROUT CB OR MH INVERT/DOGHOUSESEACH1$542.00$542.00$630.13$630.13$350.00$350.00
2506.602ADJUST FRAME & RING CASTING (CB-HDPE RINGS)EACH9$297.00$2,673.00$586.99$5,282.91$450.00$4,050.00
2506.602RE-MORTAR 1' SECTIONEACH2$571.00$1,142.00$437.87$875.74$395.00$790.00
2521.5183" CONCRETE WALKS F1,000$6.70$6,700.00$6.33$6,330.00$8.00$8,000.00
2521.5186" CONCRETE WALKS F1,075$15.00$16,125.00$13.44$14,448.00$17.00$18,275.00
2521.5183" BITUMINOUS WALKS F246$2.00$492.00$6.54$1,608.84$9.00$2,214.00
2531.503CONCRETE CURB DESIGN V6L F50$57.00$2,850.00$64.61$3,230.50$42.00$2,100.00
2531.503CONCRETE CURB & GUTTER DESIGN B618L F720$47.00$33,840.00$43.49$31,312.80$41.00$29,520.00
2531.503CONCRETE CURB & GUTTER DESIGN B618L F375$34.00$12,750.00$42.37$15,888.75$41.00$15,375.00
2531.618TRUNCATED DOMESS F140$73.50$10,290.00$65.19$9,126.60$50.00$7,000.00
2563.601TRAFFIC CONTROLLS1$6,530.00$6,530.00$21,786.24$21,786.24$5,000.00$5,000.00
2563.601TRAFFIC CONTROLLS1$11,876.00$11,876.00$38,785.63$38,785.63$70,000.00$70,000.00
2565.616REVISE SIGNAL SYSTEM ISYS1$46,869.00$46,869.00$42,225.00$42,225.00$50,000.00$50,000.00
2572.506WATERGAL4,200$0.10$420.00$0.04$168.00$0.80$3,360.00
2573.502STORM DRAIN INLET PROTECTIONEACH4$190.00$760.00$150.44$601.76$168.00$672.00
2574.507COMMON TOPSOIL BORROWC Y72$48.50$3,492.00$50.15$3,610.80$50.00$3,600.00
2574.507BOULEVARD TOPSOIL BORROWC Y5$48.50$242.50$50.15$250.75$90.00$450.00
2575.602SITE RESTORATIONEACH5$615.00$3,075.00$877.55$4,387.75$265.00$1,325.00
2575.604SEEDINGS Y50$25.50$1,275.00$7.02$351.00$9.00$450.00
2575.604SEEDINGS Y500$12.50$6,250.00$7.02$3,510.00$10.00$5,000.00
2582.50312" SOLID LINE PREF TAPE GR IN (WR)L F715$13.50$9,652.50$12.03$8,601.45$12.60$9,009.00
2582.50324" SOLID LINE MULTI COMPL F402$7.80$3,135.60$7.02$2,822.04$7.35$2,954.70
2582.5034" BROKEN LINE MULTI COMPL F3,400$0.25$850.00$0.23$782.00$0.24$816.00
2582.50324" SOLID LINE PREF TAPE GR IN (WR)L F182$27.00$4,914.00$24.07$4,380.74$25.20$4,586.40
2582.5034" SOLID LINE MULTI COMPL F36,000$0.25$9,000.00$0.23$8,280.00$0.24$8,640.00
2582.5034" BROKEN LINE PREF TAPE (WR)L F90$6.70$603.00$6.02$541.80$6.30$567.00
2582.518PAVT MSSG MULTI COMPS F375$8.90$3,337.50$8.02$3,007.50$8.40$3,150.00
2582.518PAVT MSSG PREF TAPE (WR)S F240$24.00$5,760.00$21.73$5,215.20$22.75$5,460.00
 Totals for project 31-104 $660,843.85 $851,066.93 $842,637.50
 
32-108 - 2020 Overlays & Misc. ProjectsBituminous Roadways, Inc. OMG Midwest Inc. dba Minnesota Paving & Materials McNamara Contracting, Inc. 
Item No.ItemUnitsQuantityUnit PriceTotal PriceUnit PriceTotal PriceUnit PriceTotal Price
2104.502SALVAGE CASTINGEACH9$94.50$850.50$163.84$1,474.56$220.66$1,985.94
2104.503REMOVE CURB & GUTTERL F2,963$6.70$19,852.10$11.08$32,830.04$23.74$70,341.62
2104.503SAWING BIT PAVEMENT (FULL DEPTH)L F600$3.90$2,340.00$2.27$1,362.00$3.12$1,872.00
2104.518REMOVE BITUMINOUS PAVEMENTS F820$0.65$533.00$1.69$1,385.80$2.60$2,132.00
2104.518REMOVE BITUMINOUS WALKS F1,349$0.65$876.85$1.35$1,821.15$2.60$3,507.40
2104.518REMOVE CONCRETE WALKS F3,080$1.20$3,696.00$3.02$9,301.60$4.16$12,812.80
2104.618REMOVE AND REPLACE BITUMINOUS PAVEMENTS F80$7.00$560.00$9.98$798.40$11.31$904.80
2211.509AGGREGATE BASE CLASS 5TON80$23.50$1,880.00$38.90$3,112.00$36.09$2,887.20
2232.504MILL BITUMINOUS SURFACE (2.0")S Y106,144$0.85$90,222.40$1.31$139,048.64$0.79$83,853.76
2357.506BITUMINOUS MATERIAL FOR TACK COAT (P)GAL5,316$3.00$15,948.00$1.60$8,505.60$1.55$8,239.80
2360.509TYPE SP 12.5 WEARING COURSE MIX (3;B)TON12,778$37.50$479,175.00$56.56$722,723.68$52.96$676,722.88
2504.602ADJUST GATE VALVEEACH1$300.00$300.00$332.23$332.23$608.58$608.58
2504.602REPAIR GATE VALVE TOP SECTION W/COVEREACH7$294.00$2,058.00$415.29$2,907.03$460.10$3,220.70
2506.502INSTALL CASTINGEACH9$650.00$5,850.00$676.04$6,084.36$1,087.01$9,783.09
2506.602REMOVE & REPLACE TOP SLAB (4' DIA CBMH)EACH4$1,997.00$7,988.00$3,163.39$12,653.56$2,601.01$10,404.04
2506.602ADJUST FRAME & RING CASTING (CB-HDPE RINGS)EACH126$297.00$37,422.00$688.50$86,751.00$608.83$76,712.58
2506.602REMOVE & REPLACE CBMH (2'X3' BOX)EACH5$5,552.00$27,760.00$4,223.13$21,115.65$4,161.62$20,808.10
2506.602ADJUST FRAME & RING CASTING (MANHOLE)EACH6$746.00$4,476.00$634.34$3,806.04$1,087.01$6,522.06
2506.602REMOVE & REPLACE FRAME & RING CASTING (27")EACH1$94.50$94.50$935.22$935.22$1,221.22$1,221.22
2506.602REPAIR/GROUT CB OR MH INVERT/DOGHOUSESEACH16$542.00$8,672.00$175.31$2,804.96$1,040.40$16,646.40
2506.602REMOVE & REPLACE CASTING (CATCH BASIN)EACH6$94.50$567.00$947.21$5,683.26$1,182.65$7,095.90
2521.5186" CONCRETE WALKS F3,578$15.00$53,670.00$12.93$46,263.54$17.08$61,112.24
2521.5184" CONCRETE WALKS F1,300$7.30$9,490.00$6.75$8,775.00$8.26$10,738.00
2531.503CONCRETE CURB & GUTTER DESIGN B618L F2,766$34.00$94,044.00$41.99$116,144.34$35.02$96,865.32
2531.503CONCRETE CURB DESIGN V6L F21$57.00$1,197.00$52.90$1,110.90$46.79$982.59
2531.618TRUNCATED DOMESS F348$61.00$21,228.00$65.19$22,686.12$51.50$17,922.00
2563.601TRAFFIC CONTROLLS1$31,330.00$31,330.00$40,239.86$40,239.86$113,409.29$113,409.29
2565.616REVISE SIGNAL SYSTEM JSYS1$35,450.00$35,450.00$32,285.00$32,285.00$33,900.00$33,900.00
2572.506WATERGAL45,000$0.10$4,500.00$0.03$1,350.00$0.15$6,750.00
2573.502STORM DRAIN INLET PROTECTIONEACH12$190.00$2,280.00$150.44$1,805.28$150.00$1,800.00
2574.507BOULEVARD TOPSOIL BORROWC Y55$48.50$2,667.50$50.15$2,758.25$50.47$2,775.85
2575.602SITE RESTORATIONEACH17$615.00$10,455.00$877.55$14,918.35$257.50$4,377.50
2575.604SEEDINGS Y460$12.50$5,750.00$7.02$3,229.20$9.27$4,264.20
2582.5034" BROKEN LINE MULTI COMPL F4,800$0.25$1,200.00$0.23$1,104.00$0.24$1,152.00
2582.50324" SOLID LINE MULTI COMPL F248$7.80$1,934.40$7.02$1,740.96$7.21$1,788.08
2582.50312" SOLID LINE PREF TAPE GR IN (WR)L F2,282$13.50$30,807.00$12.03$27,452.46$12.36$28,205.52
2582.5034" SOLID LINE MULTI COMPL F48,000$0.25$12,000.00$0.23$11,040.00$0.24$11,520.00
2582.5034" BROKEN LINE PREF TAPE (WR)L F300$6.70$2,010.00$6.02$1,806.00$6.18$1,854.00
2582.50324" SOLID LINE PREF TAPE GR IN (WR)L F590$27.00$15,930.00$24.07$14,201.30$24.72$14,584.80
2582.518PAVT MSSG MULTI COMPS F570$8.90$5,073.00$8.02$4,571.40$8.24$4,696.80
2582.518PAVT MSSG PREF TAPE (WR)S F555$24.00$13,320.00$21.73$12,060.15$22.32$12,387.60
 Totals for project 32-108 $1,065,457.25 $1,430,978.89 $1,449,368.66
 
42-158 - 2020 Overlays & Misc. ProjectsBituminous Roadways, Inc. OMG Midwest Inc. dba Minnesota Paving & Materials McNamara Contracting, Inc. 
Item No.ItemUnitsQuantityUnit PriceTotal PriceUnit PriceTotal PriceUnit PriceTotal Price
2104.503SAWING BIT PAVEMENT (FULL DEPTH)L F33$3.90$128.70$2.27$74.91$3.00$99.00
2104.503REMOVE CURB & GUTTERL F192$6.70$1,286.40$12.96$2,488.32$12.00$2,304.00
2104.518REMOVE CONCRETE DRIVEWAY PAVEMENTS F1,047$1.40$1,465.80$3.93$4,114.71$3.00$3,141.00
2104.518REMOVE BITUMINOUS PAVEMENTS F458$0.50$229.00$1.69$774.02$1.00$458.00
2521.5183" BITUMINOUS WALKS F368$2.00$736.00$4.37$1,608.16$8.00$2,944.00
2531.503CONCRETE CURB & GUTTER DESIGN B618L F87$34.00$2,958.00$43.35$3,771.45$75.00$6,525.00
2563.601TRAFFIC CONTROLLS1$8,278.00$8,278.00$4,513.11$4,513.11$9,000.00$9,000.00
2574.507COMMON TOPSOIL BORROWC Y200$48.50$9,700.00$50.15$10,030.00$51.00$10,200.00
2575.604SEEDINGS Y142$12.50$1,775.00$7.02$996.84$13.00$1,846.00
 Totals for project 42-158 $26,556.90 $28,371.52 $36,517.00
 
46-51 - 2020 Overlays & Misc. ProjectsBituminous Roadways, Inc. OMG Midwest Inc. dba Minnesota Paving & Materials McNamara Contracting, Inc. 
Item No.ItemUnitsQuantityUnit PriceTotal PriceUnit PriceTotal PriceUnit PriceTotal Price
2104.502REMOVE CASTINGEACH55$94.50$5,197.50$163.84$9,011.20$70.00$3,850.00
2104.502SALVAGE CASTINGEACH30$94.50$2,835.00$163.84$4,915.20$70.00$2,100.00
2104.502REMOVE DRAINAGE STRUCTUREEACH1$1,084.00$1,084.00$1,260.16$1,260.16$1,500.00$1,500.00
2104.503REMOVE AND REPLACE STORM SEWER PIPEL F8$89.00$712.00$62.98$503.84$120.00$960.00
2104.503REMOVE CURB & GUTTERL F600$6.70$4,020.00$10.48$6,288.00$12.00$7,200.00
2104.503REMOVE CURB & GUTTERL F672$6.70$4,502.40$11.43$7,680.96$12.00$8,064.00
2104.503SAWING BIT PAVEMENT (FULL DEPTH)L F1,177$3.90$4,590.30$2.27$2,671.79$2.00$2,354.00
2104.503REMOVE CURB & GUTTERL F1,080$6.70$7,236.00$11.07$11,955.60$12.00$12,960.00
2104.518REMOVE CONCRETE WALKS F845$1.20$1,014.00$3.94$3,329.30$1.50$1,267.50
2104.518REMOVE CONCRETE WALKS F1,498$1.20$1,797.60$3.76$5,632.48$1.50$2,247.00
2104.518REMOVE BITUMINOUS PAVEMENTS F1,592$0.50$796.00$1.69$2,690.48$1.00$1,592.00
2104.518REMOVE CONCRETE WALKS F2,490$1.20$2,988.00$3.14$7,818.60$1.50$3,735.00
2104.518REMOVE BITUMINOUS WALKS F4,624$0.65$3,005.60$1.35$6,242.40$1.00$4,624.00
2232.504MILL BITUMINOUS SURFACE (2.0")S Y88,313$0.85$75,066.05$1.30$114,806.90$2.00$176,626.00
2357.506BITUMINOUS MATERIAL FOR TACK COAT (P)GAL4,425$3.00$13,275.00$1.60$7,080.00$2.50$11,062.50
2357.506BITUMINOUS MATERIAL FOR TACK COAT (P)GAL11$3.00$33.00$1.60$17.60$2.50$27.50
2360.509TYPE SP 12.5 WEARING COURSE MIX (3;B)TON10,610$37.50$397,875.00$57.36$608,589.60$55.00$583,550.00
2360.509TYPE SP 12.5 WEARING COURSE MIX (3;B)TON72$98.00$7,056.00$141.99$10,223.28$75.00$5,400.00
2504.602ADJUST GATE VALVEEACH3$300.00$900.00$332.23$996.69$500.00$1,500.00
2506.502CONST DRAINAGE STRUCTURE DESIGN SPEC 1EACH1$6,437.00$6,437.00$3,634.76$3,634.76$3,600.00$3,600.00
2506.502ADJUST FRAME & RING CASTINGEACH30$746.00$22,380.00$723.64$21,709.20$500.00$15,000.00
2506.502ADJUST FRAME & RING CASTINGEACH55$746.00$41,030.00$511.04$28,107.20$500.00$27,500.00
2506.502CASTING ASSEMBLYEACH63$961.00$60,543.00$997.25$62,826.75$500.00$31,500.00
2506.503RECONSTRUCT DRAINAGE STRUCTUREL F4.9$2,037.00$9,981.30$5,392.07$26,421.14$2,200.00$10,780.00
2506.602MODIFY DRAINAGE STRUCTURE (FILL SUMP CBMH)EACH2$1,701.00$3,402.00$1,524.93$3,049.86$950.00$1,900.00
2506.602RE-MORTAR INVERTEACH4$485.00$1,940.00$175.31$701.24$400.00$1,600.00
2506.602PLUG DOGHOUSEEACH15$628.00$9,420.00$823.19$12,347.85$275.00$4,125.00
2506.602MODIFY DRAINAGE STRUCTURE (FILL SUMP CB)EACH20$1,312.00$26,240.00$1,081.04$21,620.80$950.00$19,000.00
2506.602RE-MORTAR DOGHOUSEEACH37$411.00$15,207.00$175.31$6,486.47$350.00$12,950.00
2506.602RE-MORTAR DOGHOUSEEACH6$411.00$2,466.00$157.56$945.36$350.00$2,100.00
2506.602RE-MORTAR 1' SECTIONEACH2$571.00$1,142.00$420.02$840.04$400.00$800.00
2506.602FILL SUMP DRAINAGE STRUCTUREEACH57$1,701.00$96,957.00$1,524.93$86,921.01$950.00$54,150.00
2521.5184" CONCRETE WALKS F471$7.30$3,438.30$7.82$3,683.22$11.00$5,181.00
2521.5183" CONCRETE WALKS F845$6.70$5,661.50$6.47$5,467.15$8.00$6,760.00
2521.5186" CONCRETE WALKS F4,725$15.00$70,875.00$12.87$60,810.75$16.00$75,600.00
2521.5184" CONCRETE WALKS F2,490$7.30$18,177.00$6.45$16,060.50$11.00$27,390.00
2521.5183" BITUMINOUS WALKS F1,713$2.00$3,426.00$3.33$5,704.29$7.00$11,991.00
2531.503CONCRETE CURB & GUTTER DESIGN B618L F600$47.00$28,200.00$39.65$23,790.00$27.00$16,200.00
2531.503CONCRETE CURB & GUTTER DESIGN B618L F1,080$47.00$50,760.00$40.41$43,642.80$44.00$47,520.00
2531.503CONCRETE CURB & GUTTER DESIGN B618L F477$34.00$16,218.00$42.23$20,143.71$44.00$20,988.00
2531.618TRUNCATED DOMESS F552$73.50$40,572.00$65.19$35,984.88$50.00$27,600.00
2563.601TRAFFIC CONTROLLS1$20,614.00$20,614.00$12,034.97$12,034.97$20,000.00$20,000.00
2563.601TRAFFIC CONTROLLS1$47,767.00$47,767.00$22,789.15$22,789.15$70,000.00$70,000.00
2563.601TRAFFIC CONTROLLS1$11,920.00$11,920.00$23,516.26$23,516.26$10,000.00$10,000.00
2565.616REVISE SIGNAL SYSTEM DSYS1$26,640.00$26,640.00$14,440.00$14,440.00$20,000.00$20,000.00
2565.616REVISE SIGNAL SYSTEM FSYS1$46,206.00$46,206.00$32,383.00$32,383.00$55,000.00$55,000.00
2565.616REVISE SIGNAL SYSTEM ESYS1$26,805.00$26,805.00$23,105.00$23,105.00$30,000.00$30,000.00
2574.507COMMON TOPSOIL BORROWC Y36$48.50$1,746.00$50.15$1,805.40$45.00$1,620.00
2575.602SITE RESTORATIONEACH23$615.00$14,145.00$877.55$20,183.65$250.00$5,750.00
2575.604SEEDINGS Y300$12.50$3,750.00$7.02$2,106.00$7.00$2,100.00
2582.5034" SOLID LINE MULTI COMPL F35,580$0.25$8,895.00$0.23$8,183.40$0.24$8,539.20
2582.50312" SOLID LINE PREF TAPE GR IN (WR)L F1,632$13.50$22,032.00$12.03$19,632.96$12.60$20,563.20
2582.5034" BROKEN LINE PREF TAPE (WR)L F180$6.70$1,206.00$6.02$1,083.60$6.30$1,134.00
2582.5034" BROKEN LINE MULTI COMPL F4,060$0.25$1,015.00$0.23$933.80$7.35$29,841.00
2582.50324" SOLID LINE PREF TAPE GR IN (WR)L F431$27.00$11,637.00$24.07$10,374.17$25.20$10,861.20
2582.518PAVT MSSG MULTI COMPS F600$8.90$5,340.00$8.02$4,812.00$8.40$5,040.00
2582.518PAVT MSSG PREF TAPE (WR)S F300$24.00$7,200.00$21.73$6,519.00$22.76$6,828.00
 Totals for project 46-51 $1,325,374.55 $1,506,515.42 $1,552,131.10
 
46-55 - 2020 Overlays & Misc. ProjectsBituminous Roadways, Inc. OMG Midwest Inc. dba Minnesota Paving & Materials McNamara Contracting, Inc. 
Item No.ItemUnitsQuantityUnit PriceTotal PriceUnit PriceTotal PriceUnit PriceTotal Price
2104.502REMOVE DRAINAGE STRUCTUREEACH6$1,084.00$6,504.00$787.59$4,725.54$600.00$3,600.00
2104.502REMOVE CASTINGEACH47$94.50$4,441.50$163.84$7,700.48$70.00$3,290.00
2104.502ABANDON WATER MAIN STRUCTUREEACH1$3,247.00$3,247.00$12,717.41$12,717.41$1,200.00$1,200.00
2104.503REMOVE AND REPLACE STORM SEWER PIPEL F136$89.00$12,104.00$193.46$26,310.56$125.00$17,000.00
2104.503REMOVE CURB & GUTTERL F1,160$6.70$7,772.00$11.07$12,841.20$12.00$13,920.00
2104.503SAWING BIT PAVEMENT (FULL DEPTH)L F172$3.90$670.80$2.27$390.44$2.00$344.00
2104.503REMOVE CURB & GUTTERL F266$6.70$1,782.20$12.63$3,359.58$12.00$3,192.00
2104.518REMOVE BITUMINOUS PAVEMENTS F252$0.50$126.00$2.03$511.56$1.00$252.00
2104.518REMOVE CONCRETE WALKS F1,365$1.20$1,638.00$3.55$4,845.75$1.50$2,047.50
2104.518REMOVE CONCRETE WALKS F1,009$1.20$1,210.80$3.75$3,783.75$1.50$1,513.50
2104.518REMOVE BITUMINOUS WALKS F836$0.65$543.40$1.69$1,412.84$1.00$836.00
2104.618REMOVE AND REPLACE BITUMINOUS PAVEMENTS F171$7.00$1,197.00$13.26$2,267.46$7.00$1,197.00
2232.504MILL BITUMINOUS SURFACE (2.0")S Y46,520$0.85$39,542.00$1.62$75,362.40$2.50$116,300.00
2357.506BITUMINOUS MATERIAL FOR TACK COAT (P)GAL2,326$3.00$6,978.00$1.60$3,721.60$2.50$5,815.00
2360.509TYPE SP 12.5 WEARING COURSE MIX (3;B)TON5,561$37.50$208,537.50$56.87$316,254.07$55.00$305,855.00
2504.602ADJUST GATE VALVEEACH3$300.00$900.00$332.23$996.69$500.00$1,500.00
2504.602ADJUST VALVE BOXEACH5$300.00$1,500.00$332.23$1,661.15$500.00$2,500.00
2506.502CASTING ASSEMBLYEACH58$961.00$55,738.00$786.28$45,604.24$500.00$29,000.00
2506.502CONST DRAINAGE STRUCTURE DES 60-4020EACH3$7,390.00$22,170.00$7,343.08$22,029.24$5,800.00$17,400.00
2506.502ADJUST FRAME & RING CASTINGEACH52$746.00$38,792.00$243.43$12,658.36$500.00$26,000.00
2506.502CONST DRAINAGE STRUCTURE DESIGN SPEC 2EACH3$7,190.00$21,570.00$4,523.18$13,569.54$3,300.00$9,900.00
2506.503RECONSTRUCT DRAINAGE STRUCTUREL F5$1,963.00$9,815.00$3,347.53$16,737.65$1,950.00$9,750.00
2506.602FILL SUMP DRAINAGE STRUCTUREEACH4$1,701.00$6,804.00$1,677.37$6,709.48$950.00$3,800.00
2506.602RE-MORTAR INVERTEACH1$485.00$485.00$420.02$420.02$400.00$400.00
2506.602RE-MORTAR DOGHOUSEEACH45$411.00$18,495.00$420.02$18,900.90$350.00$15,750.00
2506.602PLUG DOGHOUSEEACH2$571.00$1,142.00$787.59$1,575.18$275.00$550.00
2521.5186" CONCRETE WALKS F2,026$15.00$30,390.00$13.10$26,540.60$16.00$32,416.00
2521.5184" CONCRETE WALKS F1,365$7.30$9,964.50$6.72$9,172.80$11.00$15,015.00
2531.503CONCRETE CURB & GUTTER DESIGN B618L F1,160$47.00$54,520.00$40.90$47,444.00$44.00$51,040.00
2531.503CONCRETE CURB & GUTTER DESIGN B618L F165$34.00$5,610.00$40.60$6,699.00$44.00$7,260.00
2531.503CONCRETE CURB DESIGN V6L F86$57.00$4,902.00$50.15$4,312.90$42.00$3,612.00
2531.618TRUNCATED DOMESS F125$73.50$9,187.50$65.19$8,148.75$50.00$6,250.00
2563.601TRAFFIC CONTROLLS1$13,451.00$13,451.00$20,783.32$20,783.32$65,000.00$65,000.00
2563.601TRAFFIC CONTROLLS1$17,136.00$17,136.00$8,524.77$8,524.77$30,000.00$30,000.00
2565.616REVISE SIGNAL SYSTEM CSYS1$30,140.00$30,140.00$27,152.00$27,152.00$35,000.00$35,000.00
2575.602SITE RESTORATIONEACH4$615.00$2,460.00$927.70$3,710.80$250.00$1,000.00
2582.50324" SOLID LINE PREF TAPE GR IN (WR)L F181$27.00$4,887.00$24.07$4,356.67$25.20$4,561.20
2582.5034" SOLID LINE MULTI COMPL F20,300$0.25$5,075.00$0.23$4,669.00$0.24$4,872.00
2582.50312" SOLID LINE PREF TAPE GR IN (WR)L F747$13.50$10,084.50$12.03$8,986.41$12.60$9,412.20
2582.5034" BROKEN LINE PREF TAPE (WR)L F120$6.70$804.00$6.02$722.40$6.30$756.00
2582.5034" BROKEN LINE MULTI COMPL F2,170$0.25$542.50$0.23$499.10$0.24$520.80
2582.518PAVT MSSG MULTI COMPS F225$8.90$2,002.50$8.02$1,804.50$8.40$1,890.00
2582.518PAVT MSSG PREF TAPE (WR)S F180$24.00$4,320.00$21.73$3,911.40$22.76$4,096.80
2582.518CROSSWALK MULTI COMPS F312$6.70$2,090.40$6.02$1,878.24$6.30$1,965.60
 Totals for project 46-55 $681,272.10 $806,383.75 $867,579.60
 
60-25 - 2020 Overlays & Misc. ProjectsBituminous Roadways, Inc. OMG Midwest Inc. dba Minnesota Paving & Materials McNamara Contracting, Inc. 
Item No.ItemUnitsQuantityUnit PriceTotal PriceUnit PriceTotal PriceUnit PriceTotal Price
2104.503SAWING BIT PAVEMENT (FULL DEPTH)L F21$3.90$81.90$2.27$47.67$3.00$63.00
2104.503REMOVE SEWER PIPE (STORM)L F4$13.50$54.00$126.07$504.28$25.00$100.00
2104.503REMOVE CURB & GUTTERL F12$6.70$80.40$15.93$191.16$15.00$180.00
2104.518REMOVE BITUMINOUS PAVEMENTS F55$0.50$27.50$2.03$111.65$1.00$55.00
2211.509AGGREGATE BASE CLASS 5TON2$23.50$47.00$38.90$77.80$25.00$50.00
2360.509TYPE SP 12.5 WEARING COURSE MIX (3;B)TON2$98.00$196.00$381.39$762.78$400.00$800.00
2503.602CONNECT TO EXISTING STORM SEWEREACH2$1,084.00$2,168.00$1,260.16$2,520.32$2,000.00$4,000.00
2506.502CASTING ASSEMBLYEACH1$961.00$961.00$908.68$908.68$1,000.00$1,000.00
2506.503CONST DRAINAGE STRUCTURE DESIGN SPEC 2L F4.6$1,427.00$6,564.20$2,376.61$10,932.41$1,000.00$4,600.00
2531.503CONCRETE CURB & GUTTER DESIGN D418L F12$34.00$408.00$45.53$546.36$200.00$2,400.00
2563.601TRAFFIC CONTROLLS1$18,295.00$18,295.00$4,513.11$4,513.11$4,000.00$4,000.00
2575.604SEEDINGS Y16$12.50$200.00$50.15$802.40$60.00$960.00
 Totals for project 60-25 $29,083.00 $21,918.62 $18,208.00
 
73-33 - 2020 Overlays & Misc. ProjectsBituminous Roadways, Inc. OMG Midwest Inc. dba Minnesota Paving & Materials McNamara Contracting, Inc. 
Item No.ItemUnitsQuantityUnit PriceTotal PriceUnit PriceTotal PriceUnit PriceTotal Price
2104.502SALVAGE CASTING (STORM)EACH3$94.50$283.50$184.33$552.99$220.11$660.33
2104.502REMOVE CASTING & RINGS (STORM)EACH14$94.50$1,323.00$184.33$2,580.62$220.58$3,088.12
2104.502SALVAGE CASTING (SANITARY)EACH6$94.50$567.00$184.33$1,105.98$180.39$1,082.34
2104.503REMOVE CURB & GUTTERL F400$6.70$2,680.00$10.48$4,192.00$16.41$6,564.00
2104.503REMOVE CURB & GUTTERL F362$6.70$2,425.40$12.80$4,633.60$16.42$5,944.04
2104.518REMOVE CONCRETE WALKS F752$1.20$902.40$4.03$3,030.56$5.20$3,910.40
2104.602REMOVE GATE VALVE TOP SECTIONEACH3$129.00$387.00$91.29$273.87$241.53$724.59
2232.504MILL BITUMINOUS SURFACE (2.0")S Y23,612$0.85$20,070.20$1.61$38,015.32$0.86$20,306.32
2357.506BITUMINOUS MATERIAL FOR TACK COAT (P)GAL1,181$3.00$3,543.00$1.60$1,889.60$1.55$1,830.55
2360.509TYPE SP 12.5 WEARING COURSE MIX (3;B)TON2,823$37.50$105,862.50$58.09$163,988.07$55.88$157,749.24
2503.602EXTERNAL MANHOLE CHIMNEY SEALEACH6$362.00$2,172.00$172.50$1,035.00$183.57$1,101.42
2504.602GATE VALVE TOP SECTIONEACH3$294.00$882.00$332.23$996.69$416.97$1,250.91
2506.602CASTING & RINGS (R-1642)EACH1$967.00$967.00$784.78$784.78$1,011.86$1,011.86
2506.602CASTING & RINGS (R-1642)EACH3$967.00$2,901.00$784.78$2,354.34$1,012.61$3,037.83
2506.602CASTING & RINGS (R-3067-V)EACH13$1,166.00$15,158.00$738.20$9,596.60$828.83$10,774.79
2506.602CASTING & RINGS (R-1642) (SANITARY)EACH6$967.00$5,802.00$784.78$4,708.68$1,012.49$6,074.94
2506.602INTERNAL ADJUSTING RING SEALANT (STORM)EACH31$690.00$21,390.00$591.72$18,343.32$566.50$17,561.50
2506.602INTERNAL ADJUSTING RING SEALANT (SANITARY)EACH10$690.00$6,900.00$377.10$3,771.00$566.50$5,665.00
2521.5186" CONCRETE WALKS F752$15.00$11,280.00$13.76$10,347.52$17.07$12,836.64
2531.503CONCRETE CURB & GUTTER DESIGN B418L F362$34.00$12,308.00$40.27$14,577.74$37.71$13,651.02
2531.503CONCRETE CURB & GUTTER DESIGN B418L F400$47.00$18,800.00$39.78$15,912.00$29.87$11,948.00
2531.618TRUNCATED DOMESS F132$73.50$9,702.00$65.19$8,605.08$51.50$6,798.00
2563.601TRAFFIC CONTROLLS1$15,354.00$15,354.00$3,510.20$3,510.20$8,925.73$8,925.73
2563.601TRAFFIC CONTROLLS1$8,650.00$8,650.00$3,510.20$3,510.20$5,775.47$5,775.47
2563.601TRAFFIC CONTROLLS1$21,313.00$21,313.00$26,994.60$26,994.60$20,476.68$20,476.68
2573.502STORM DRAIN INLET PROTECTIONEACH25$190.00$4,750.00$150.44$3,761.00$150.00$3,750.00
2574.507BOULEVARD TOPSOIL BORROWC Y20$48.50$970.00$50.15$1,003.00$76.22$1,524.40
2575.504SODDING TYPE SALT TOLERANTS Y100$25.50$2,550.00$30.09$3,009.00$25.75$2,575.00
2575.602SITE RESTORATIONEACH11$615.00$6,765.00$927.70$10,204.70$283.25$3,115.75
2582.50324" SOLID LINE MULTI COMPL F38$7.80$296.40$7.02$266.76$7.21$273.98
2582.5034" SOLID LINE MULTI COMPL F15,877$0.25$3,969.25$0.23$3,651.71$0.24$3,810.48
2582.5034" BROKEN LINE MULTI COMPL F200$0.25$50.00$0.23$46.00$0.24$48.00
2582.518PAVT MSSG MULTI COMPS F90$8.90$801.00$8.02$721.80$8.24$741.60
2582.518PAVT MSSG PREF TAPE (WR)S F120$24.00$2,880.00$21.73$2,607.60$22.32$2,678.40
 Totals for project 73-33 $314,654.65 $370,581.93 $347,267.33
 
Contract Total:$7,567,787.40$8,722,733.40$8,843,313.01