Bid Abstract

28-60 - 2020 Overlays & Misc. ProjectsMcNamara Contracting, Inc. Bituminous Roadways, Inc. OMG Midwest Inc. dba Minnesota Paving & Materials 
Item No.ItemUnitsQuantityUnit PriceTotal PriceUnit PriceTotal PriceUnit PriceTotal Price
2104.502REMOVE CASTING & RINGS (STORM)EACH8$220.94$1,767.52$94.50$756.00$163.84$1,310.72
2104.503REMOVE CURB & GUTTERL F200$23.52$4,704.00$6.70$1,340.00$12.83$2,566.00
2104.503REMOVE CURB & GUTTERL F100$21.43$2,143.00$6.70$670.00$12.53$1,253.00
2112.603SHOULDER PREPARATIONL F1,695$2.17$3,678.15$1.20$2,034.00$1.12$1,898.40
2221.509SHOULDER BASE AGGREGATE CLASS 2 MODTON40$68.27$2,730.80$38.00$1,520.00$45.66$1,826.40
2232.504MILL BITUMINOUS SURFACE (2.0")S Y8,099$1.52$12,310.48$0.85$6,884.15$1.55$12,553.45
2357.506BITUMINOUS MATERIAL FOR TACK COAT (P)GAL405$1.55$627.75$3.00$1,215.00$1.60$648.00
2360.509TYPE SP 12.5 WEARING COURSE MIX (3;B)TON968$56.33$54,527.44$37.50$36,300.00$57.43$55,592.24
2506.602CASTING & RINGS (R-3067-V)EACH3$891.58$2,674.74$1,166.00$3,498.00$823.78$2,471.34
2506.602CASTING & RINGS (R-3250-DVSP)EACH5$1,046.94$5,234.70$1,319.00$6,595.00$1,017.68$5,088.40
2506.602INTERNAL ADJUSTING RING SEALANT (STORM)EACH9$566.50$5,098.50$690.00$6,210.00$591.72$5,325.48
2531.503CONCRETE CURB & GUTTER DESIGN B618L F100$52.40$5,240.00$34.00$3,400.00$45.52$4,552.00
2531.503CONCRETE CURB & GUTTER DESIGN B618L F200$52.20$10,440.00$105.00$21,000.00$45.85$9,170.00
2563.601TRAFFIC CONTROLLS1$3,465.28$3,465.28$13,079.00$13,079.00$4,513.11$4,513.11
2563.601TRAFFIC CONTROLLS1$7,350.60$7,350.60$20,406.00$20,406.00$38,058.52$38,058.52
2573.502STORM DRAIN INLET PROTECTIONEACH9$149.31$1,343.79$190.00$1,710.00$150.44$1,353.96
2574.507BOULEVARD TOPSOIL BORROWC Y12$76.22$914.64$48.50$582.00$50.15$601.80
2575.504SODDING TYPE SALT TOLERANTS Y70$25.75$1,802.50$30.50$2,135.00$30.09$2,106.30
2582.50324" SOLID LINE MULTI COMPL F44$7.21$317.24$7.80$343.20$7.02$308.88
2582.5034" SOLID LINE MULTI COMPL F7,276$0.24$1,746.24$0.25$1,819.00$0.23$1,673.48
2582.518PAVT MSSG MULTI COMPS F15$8.24$123.60$8.90$133.50$8.02$120.30
2582.518CROSSWALK MULTI COMPS F198$6.18$1,223.64$6.70$1,326.60$6.02$1,191.96
 Totals for project 28-60 $129,464.61 $132,956.45 $154,183.74
 
Contract Total:$129,464.61$132,956.45$154,183.74