08-28 - 2019 Overlay & Misc. Projects (2020 Season)Bituminous Roadways, Inc. McNamara Contracting, Inc. Hardrives, Inc. Valley Paving Inc 
Item No.ItemUnitsQuantityUnit PriceTotal PriceUnit PriceTotal PriceUnit PriceTotal PriceUnit PriceTotal Price
2101.524CLEARINGTREE1$543.00$543.00$1,500.00$1,500.00$501.40$501.40$420.00$420.00
2101.524GRUBBINGTREE1$543.00$543.00$1,500.00$1,500.00$501.40$501.40$120.00$120.00
2104.502REMOVE CASTING (STORM)EACH1$98.00$98.00$100.00$100.00$150.42$150.42$181.71$181.71
2104.502REMOVE MANHOLE (SANITARY)EACH5$1,263.00$6,315.00$1,700.00$8,500.00$1,504.21$7,521.05$3,057.48$15,287.40
2104.502REMOVE DRAINAGE STRUCTUREEACH6$918.00$5,508.00$1,125.00$6,750.00$1,002.81$6,016.86$764.37$4,586.22
2104.503REMOVE CURB & GUTTERL F170$10.50$1,785.00$20.00$3,400.00$10.49$1,783.30$45.15$7,675.50
2104.503REMOVE CURB & GUTTERL F103$10.50$1,081.50$20.00$2,060.00$10.49$1,080.47$47.65$4,907.95
2104.503SAWING BIT PAVEMENT (FULL DEPTH)L F276$3.00$828.00$2.00$552.00$2.79$770.04$2.22$612.72
2104.518REMOVE BITUMINOUS PAVEMENTS F1,541$0.50$770.50$1.00$1,541.00$1.86$2,866.26$2.19$3,374.79
2104.518REMOVE BITUMINOUS WALKS F2,041$1.30$2,653.30$1.00$2,041.00$1.96$4,000.36$1.13$2,306.33
2106.507EXCAVATION - COMMON (P)C Y104$26.00$2,704.00$35.00$3,640.00$23.47$2,440.88$8.77$912.08
2106.507COMMON EMBANKMENT (CV) (P)C Y281$43.00$12,083.00$31.00$8,711.00$30.04$8,441.24$27.24$7,654.44
2231.604BITUMINOUS PATCH SPECIALS Y90$66.50$5,985.00$120.00$10,800.00$73.36$6,602.40$230.21$20,718.90
2232.504MILL BITUMINOUS SURFACE (2.0")S Y11,367$1.30$14,777.10$2.00$22,734.00$2.02$22,961.34$1.50$17,050.50
2357.506BITUMINOUS MATERIAL FOR TACK COAT (P)GAL574$3.80$2,181.20$2.00$1,148.00$1.60$918.40$2.71$1,555.54
2360.509TYPE SP 12.5 WEARING COURSE MIX (3;B)TON1,378$51.50$70,967.00$51.00$70,278.00$68.29$94,103.62$69.72$96,074.16
2503.50315" RC PIPE SEWER CLASS VL F29$74.50$2,160.50$130.00$3,770.00$85.24$2,471.96$112.09$3,250.61
2503.602CONNECT INTO EXISTING DRAINAGE STRUCTUREEACH2$1,320.00$2,640.00$2,300.00$4,600.00$1,805.06$3,610.12$1,257.13$2,514.26
2504.602ADJUST GATE VALVEEACH12$239.00$2,868.00$500.00$6,000.00$363.67$4,364.04$594.08$7,128.96
2506.502CASTING ASSEMBLY (SANITARY)EACH37$918.00$33,966.00$1,200.00$44,400.00$1,136.64$42,055.68$1,507.96$55,794.52
2506.502CASTING ASSEMBLY (STORM)EACH9$1,104.00$9,936.00$1,200.00$10,800.00$930.09$8,370.81$1,230.04$11,070.36
2506.502CONST DRAINAGE STRUCTURE DESIGN SPEC (2'X3')EACH8$4,535.00$36,280.00$4,125.00$33,000.00$5,214.60$41,716.80$2,502.79$20,022.32
2506.502ADJUST FRAME & RING CASTINGEACH6$666.00$3,996.00$700.00$4,200.00$742.39$4,454.34$1,107.99$6,647.94
2506.603CONSTRUCT SANITARY SEWER MANHOLE (48" DIA)L F57$1,068.00$60,876.00$790.00$45,030.00$977.82$55,735.74$3,215.58$183,288.06
2521.5183" CONCRETE WALKS F598$6.50$3,887.00$14.00$8,372.00$6.67$3,988.66$10.61$6,344.78
2521.5183" BITUMINOUS WALKS F1,951$1.30$2,536.30$4.00$7,804.00$5.01$9,774.51$5.57$10,867.07
2521.5186" CONCRETE WALKS F328$19.00$6,232.00$24.00$7,872.00$16.15$5,297.20$23.76$7,793.28
2531.503CONCRETE CURB & GUTTER DESIGN B418L F174$44.50$7,743.00$55.00$9,570.00$48.61$8,458.14$46.20$8,038.80
2531.503CONCRETE CURB & GUTTER DESIGN B618L F170$44.00$7,480.00$55.00$9,350.00$48.42$8,231.40$45.96$7,813.20
2531.503CONCRETE CURB DESIGN V6L F22$63.00$1,386.00$60.00$1,320.00$32.94$724.68$66.00$1,452.00
2531.503CONCRETE CURB DESIGN V4L F16$63.00$1,008.00$60.00$960.00$27.88$446.08$66.00$1,056.00
2531.503CONCRETE CURB & GUTTER DESIGN B618L F103$44.50$4,583.50$55.00$5,665.00$55.41$5,707.23$46.20$4,758.60
2531.5048" CONCRETE DRIVEWAY PAVEMENTS Y29$121.00$3,509.00$200.00$5,800.00$118.72$3,442.88$129.53$3,756.37
2531.618TRUNCATED DOMESS F70$55.00$3,850.00$60.00$4,200.00$65.18$4,562.60$58.80$4,116.00
2563.601TRAFFIC CONTROLLS1$16,904.00$16,904.00$10,000.00$10,000.00$38,000.00$38,000.00$13,593.24$13,593.24
2563.601TRAFFIC CONTROLLS1$14,790.00$14,790.00$5,000.00$5,000.00$23,000.00$23,000.00$22,759.43$22,759.43
2564.518SIGN PANELS TYPE CS F46$70.50$3,243.00$65.00$2,990.00$60.17$2,767.82$51.00$2,346.00
2573.502STORM DRAIN INLET PROTECTIONEACH4$355.00$1,420.00$150.00$600.00$150.42$601.68$164.35$657.40
2573.502STORM DRAIN INLET PROTECTIONEACH10$355.00$3,550.00$150.00$1,500.00$150.42$1,504.20$164.35$1,643.50
2573.503SILT FENCE; TYPE HIL F248$5.30$1,314.40$7.00$1,736.00$4.51$1,118.48$6.00$1,488.00
2575.604SEEDINGS Y513$5.60$2,872.80$6.00$3,078.00$4.76$2,441.88$4.80$2,462.40
2582.50312" SOLID LINE MULTI COMPL F84$7.10$596.40$8.00$672.00$6.52$547.68$7.92$665.28
2582.5034" SOLID LINE MULTI COMPL F6,850$0.30$2,055.00$0.25$1,712.50$0.28$1,918.00$0.34$2,329.00
2582.5034" BROKEN LINE MULTI COMPL F700$0.30$210.00$0.25$175.00$0.28$196.00$0.34$238.00
2582.518PAVT MSSG MULTI COMPS F195$10.50$2,047.50$11.00$2,145.00$9.53$1,858.35$11.57$2,256.15
2582.518CROSSWALK PREF TAPE GR IN (WR)S F192$19.00$3,648.00$21.00$4,032.00$17.55$3,369.60$21.32$4,093.44
 Totals for project 08-28 $376,411.00 $391,608.50 $451,396.00 $583,683.21
 
Contract Total:$376,411.00$391,608.50$451,396.00$583,683.21